For a big concert staged during Super Bowl weekend at Mystic Lake Casino in the Twin Cities area, The Legacy Production Group got a big last-minute order for gear. “They took every last fixture we had and incorporated it into the design,” said Tom Gorman. “Our next problem was that, while we had the fixtures, we didn’t have the cable and distros to power them up, and they wanted to load in fairly soon.” The phone call had come in about ten days before load-in would commence in the ballroom, as the casino’s large stage in the theater was unavailable.