Skip to content

Designing a Show in Four Weeks

Share this Post:

Tarantula visuals were core to the design concept. Photo by John De La Casa/Pure Nation Visuals

Amish Dani’s company, FRAMEWORX, was able to execute the Peso Pluma ‘Doble P’ tour in less than four weeks from phone call to opening night—an incredibly brief span of time. Two of those weeks were spent entirely on conceptualization, before a single piece of gear was pulled. “We knew it was not going to be possible to do any fabrication, so lighting and video alone would do the heavy lifting as our main production elements,” Dani said.

To learn more about this challenge, and how Dani and the team from FRAMEWORX pulled it off with an assist from 3G Productions, CLICK HERE.