Skip to content

NYE 2020 with the Jonas Brothers

Share this Post:

The brothers performed poolside at the Fontainebleau Miami Beach Hotel, with a big assist from the crew.

Lighting Co

Everlast Productions

Venue

Fontainebleau Hotel

Miami Beach, FL

Crew

Promoter/Producer: David McCranie

Production Manager: Mike Deblois

Lighting Designer: Joey Troup

Lighting Director: Tyler Frank

Lighting Techs: Mike Hale, Nick Catrambone, Jonathan Stachler, Axel Rocafort, Justin Matthews

Set Design: Tyler Frank

Set Construction: Mike Fury, Stephen Davis, Justin Brumley

Rigger: Mike Swan

Video Director: Mike Flusberg, Grant Draper

Video/Staging Co: Everlast Productions

Staging Carpenter: Rich Ruz

Gear

1       grandMA2 Full

1       grandMA2 Light

18     Martin MAC Viper Performances

34     Martin MAC Viper Profiles

18     Martin MAC Quantum Washes

60     Elation Platinum Beam 5R Extremes

18     Elation DTW IP Blinders

44     Elation SixBAR 1000’s

48     Chauvet Maverick Storm 1’s

170  Chauvet COLORado 1 Tours

24     Chauvet COLORado 4 IP’s

36     SGM Q-7’s

40     Color Kinetic ColorBlasts

1       FX setup including pyro, lasers, 8 Cryo Jets, 4 FQ100 foggers, 4         Z350 Fazers, 3 F5 Fazers

1       Staging setup w/200 4’x8’ stage decks, 485’ Super Truss (20.5” x 30”), 775’ 20” box truss, 1,430’ 12” box truss, 25 20” corner blocks, 30 12” corner blocks

1       Rigging setup w/Chain Master motors (10 1-ton, 16 ½-ton, 14 ¼-ton)

1       Video setup w/144 4mm LED panels, 3 Barco HDX W20 Flex projectors