Skip to content

Maroon 5 Tour

Share this Post:

Lighting Co
Upstaging

Venue
Various (Tour)

Crew

  • Production/Lighting Designer: Roy Bennett/Seven Design Works
  • Lighting Director: Brian Jenkins
  • Lighting Programmers: Jason Baeri, Brian Jenkins
  • Upstaging Rep: John Huddleston
  • Lighting Crew Chief: Mike Green
  • Lighting Techs: Wade Cotten, Jason Winfree, Kile McClure,
  • Calvin Mosier, Steve Hiben
  • Tour Manager: Fred Kharazzi
  • Production Manager: Alan Hornall
  • Production Coordinator: Alicia Beer
  • Stage Manager: Harold Behrens
  • Video Director: Gerald McReynolds
  • Video Programmer: Loren Barton
  • Video Co: PRG/Nocturne/Nick Jackson, John Wiseman
  • Video Techs: Graham Holwill, Timothy Cerola, Mason Braislin,
  • Josh Phebus
  • Riggers: Scott Fremgen, Francisco Attwell
  • Automation: Aaron Levy, Stan Fruge
  • Staging: Tait/Brian Levine
  • Trucking: Janco


Gear

  • 2               MA grandMA2 consoles
  • 6               grandMA2 NPUs
  • 14            grandMA2 2 & 4port nodes
  • 108         Claypaky Mythos
  • 53            Vari*Lite VL3500 Wash FX’s
  • 24            Claypaky Sharpy Wash 330s
  • 12            Robe BMFL Spots
  • 95            Robe Robin CycFX 8’s
  • 8               Robe Robin CycFX 4’s
  • 216         Ayrton MagicBlade-R’s
  • 371         Saber 1000 1m LED strips
  • 3               Saber 500 .5m LED strips
  • 2               Barco 28K projectors
  • 4               HES FQ-100 foggers
  • 2               MDG Atmosphere HO hazers
  • 6               Reel EFX RE II fans
  • 14            Truss pods
  • 1               Tait Navigator system

 

More Maroon 5 tour photos by Steve Jennings:

{gallery}17/03/maroon-5{/gallery}