Lighting Co
Port Lighting Systems
Venue
Citi Center Wang Theater
Boston, MA
Crew
Producer: Corinthian Events
Production Manager: Elizabeth J. Iannessa, CMP
LD/Lighting Director: Tyler C. Trofatter
Lighting Techs: Steve Bearse, Pat Meloveck, Karim Badwan, Mariana Maranhao, Josh Rowe, John Beaulieu, IATSE Local 11
Set Construction: Port Lighting Systems, IATSE Local 11
Rigger: Russell Jones/IATSE Local 11
Staging Co: United Staging and Rigging
Video Cos: A-V Presentations (House) Zasco Productions (Stage)
Video Directors: Morris Beverly (AVP), Travis Shirley (Headliner)
Gear
House Rig
2 High End Systems Hog4 consoles
85 Martin MAC Auras
45 Martin MAC Viper Profiles
14 Robe Robin DLS Profiles
2 Martin MAC 2000 Profiles
60 Chroma-Q Color Force Compacts
10 Chroma-Q Color Force 72s
100 Eternal Lighting RGBWA CUBEechos
8 Clay Paky Igloo waterproof enclosures
150 Color Kinetics SLX RGB LED nodes
8 Pathway Connectivity Pathport Uno units
2 Pathway Connectivity Pathport Quattro units
2 Pathway VIA Smart Switches
Stage Rig
2 grandMA 2 Full consoles w/ 2 NPUs
36 Martin MAC Auras
20 Martin MAC Viper Profiles
10 Martin MAC 2000 Wash XBs
8 Martin MAC 2000 Profiles
24 Clay Paky Sharpys
16 Martin Mac 101s
13 Martin Atomic 3000 strobes w/scrollers
8 8-lite Blinders
4 Lycian 1275 followspot
2 PRG Mbox Extreme V3 media servers
4 18K Barco projectors (AVP)
144 Oracle Black Widow HD9 LED tiles (Zasco)
1 Pathway Connectivity Pathport Quattro
1 Pathway VIA Smart Switches
20 CM ½-ton motors
9 CM 1-ton motors
10 CM ¼-ton motors
240’ Thomas 20.5” truss
6 20.5” bookend hinge plates