Lighting Co:
Morris
Video Co:
Screenworks NEP
Crew
Production Manager: Ed Wannebo
Lighting Designer: Mike Swinford
Lighting Programmer: Mark Butts
Lighting Director: Phil Ealy
Lighting Crew: Allen Gibson (crew chief), Ryder Deas, Travis Edwards, Jerome Thompson, Austin Schussler, Kevin Lichty, Ryan Hodge
Video Director: Jay Cooper
Video Crew: Brian Littleton (Crew Chief), Bob Larkin (EIC), Jon Bailey, Autin Smith, Chaim Chavarria, Alex Keene, Will Cabral, Ryan Rushing
Stage Manager: Tom Nisun
Assistant Tour Manager: Robin Majors
Production Assistant: Jill Trunnell
Automation: Mark McKinney, Daniel Wright, Nate Loftis
Rigging: Dwayne “Buzz” Gibson, Robbie Sheene, Jimmy Vaughan, Marc Knowles
Gear
4 grandMA2 consoles
181 Clay Paky Mythos fixtures
60 Vari*Lite VL3500 Wash fixtures
28 Vari*Lite VL3500 Wash FX fixtures
40 Clay Paky Stormy LED strobes
24 Clay Paky Sharpy Wash fixtures
78 Solaris LED Flare fixtures
12 Solaris LED Flare Jr fixtures
6 Lycian 2.5K spot fixtures
3 3K spot fixtures
1 Daktronics 10mm video wall (center, 48’x17.5’)
1 Daktronics 10mm video wall (header, 48’x12’)
2 Daktronics 10mm video wall (sides/stadiums, 24’x17.5’ each)
TOUR NOTES
Kenny Chesney’s Big Revival tour was a 57-stop outing with 18 of those being stadium dates, including such vaunted venues as Soldier Field, the Rose Bowl, Lambeau Field and San Francisco’s new Levi’s Stadium. The tour kicked off March 25 at Nashville’s Bridgestone Arena and concluded August 29 at Gillette Stadium in Foxboro, MA.
More tour photos at:
http://www.prolightingspace.com/photo/albums/kenny-chesney-gallery-released-by-kenny-chesney